What is the Zauro polder project?
Q: What is the Zauro polder project?
A: The Zauro polder project is an irrigation plan for the Rima River floodplain in Kebbi State, Nigeria.
Q: Why did the project start?
A: The project started because the yearly rainfall in Kebbi is not much, which makes it difficult to farm.
Q: How much is the annual rainfall in Kebbi?
A: The annual rainfall in Kebbi is about 800 millimetres (31 in).
Q: What are the temperatures like in Kebbi?
A: The temperatures in Kebbi are about 26°C (79°F), ranging from 21 to 40°C (70 to 104°F) between April and June.
Q: Why is there little or no farming in Kebbi?
A: There is little or no farming in Kebbi due to the low amount of rainfall.
Q: What are dams and irrigation plans used for in Kebbi?
A: Dams and irrigation plans are used in Kebbi to make use of the abundant water during the rainy season for farming in the dry season.
Q: Which state is the Zauro polder project located in?
A: The Zauro polder project is located in Kebbi State, Nigeria.