The Downtown Line (DTL), will be the fifth Mass Rapid Transport line in Singapore, the third to be completely underground, and with 3-car trains, the second medium capacity line. Currently in various stages of construction, it will open up in phases, such as Stage 1 in 2013, Stage 2 in 2015 and Stage 3 in 2017. The line is colored blue on the MRT Rail map.