Skip to content
Home

British Rail Class 390 Pendolino

An electric tilting multiple unit introduced in 2001 for high-speed services on the West Coast Main Line; built as nine-car sets with active tilt to reduce journey times on curved track.

The British Rail Class 390, commonly called the Pendolino, is a high-speed electric multiple unit designed with active tilting to allow faster running on existing curved lines. Introduced into UK intercity service in the early 2000s, the Class 390 established a distinctive profile on the West Coast Main Line and became a familiar express train on long-distance routes linking London with major cities in the north-west and Scotland.

Image gallery

10 Images

Design and characteristics

Class 390 trains are formed as nine-car units and are electrically powered. Their key technical feature is an active tilt system that leans the car bodies into curves, reducing lateral forces felt by passengers and permitting higher speeds on sections of track that were not designed for modern high-speed operation. The Pendolino name reflects the rolling, pendulum-like motion produced by the tilt mechanism.

  • Formation: Nine-car fixed sets.
  • Power: Electric traction for mainline services.
  • Tilt system: Active tilt derived from Italian Pendolino technology; the mechanism allows several degrees of body tilt through curves.
  • Passenger accommodation: Mixed first and standard class seating, luggage areas and on-board catering in standard intercity layouts.

History and manufacture

The Class 390 was produced for a UK rail franchise in the early 2000s. The trains were manufactured by the Italian company responsible for Pendolino technology and assembled in the United Kingdom. The sets entered service from 2001 and were delivered over a multi-year programme to replace older intercity rolling stock and shorten journey times without wholesale line rebuilding. For more on the manufacturer see manufacturer and the tilt technology at tilt system.

Assembly took place at a Birmingham works that was among the last major UK locomotive and trainbuilding facilities; that plant closed shortly after the completion of the build programme. The new trains were ordered and introduced by the franchise operator at the time, Virgin Trains, and later continued in service under successors such as Avanti West Coast. The principal UK assembly location is noted as Washwood Heath in contemporary accounts.

Operational role and significance

Class 390 Pendolinos were intended to speed up intercity services where building straighter track would be impractical or costly. By allowing higher cornering speeds, they delivered shorter timetables and improved service frequencies on established routes. In their first years they helped shape expectations for modern long-distance travel in the UK, though early operations faced teething problems typical of new fleet introductions.

Over time the Class 390 fleet has been refurbished and updated to extend service life and improve passenger comfort. They remain a notable example of how tilting train technology can be applied to increase line speeds without major infrastructure change, and they are often cited when discussing the trade-offs between new-build high-speed lines and upgrading existing corridors.

Related articles

Author

AlegsaOnline.com British Rail Class 390 Pendolino

URL: https://en.alegsaonline.com/art/14430

Share