Clyde Wind Farm — proposed 548 MW onshore wind project in South Lanarkshire

Overview of the Clyde Wind Farm: a proposed 548 MW onshore wind development in South Lanarkshire, Scotland, approved in 2008 and planned to be Europe's largest onshore wind farm.

Overview

The Clyde Wind Farm is a proposed large-scale onshore wind development in South Lanarkshire, Scotland. Planned for a capacity of 548 megawatts (MW), the project was promoted by Scottish and Southern Energy and described at approval as capable of supplying power to approximately 320,000 homes. The development site spans both sides of the M74 motorway in the central belt of Scotland and was intended to surpass the then-largest UK onshore facility, Whitelee Wind Farm.

Image gallery

2 Images

Design and characteristics

The scheme envisaged 152 wind turbines distributed across upland and moorland terrain. At the scale proposed, the farm would consist of modern multi-megawatt turbines with foundations, access tracks and electrical infrastructure to connect the array to the national grid. Key technical characteristics often highlighted for projects of this size include total installed capacity (548 MW), expected annual energy output depending on wind speed, and the number of homes served as an illustrative metric for public communication.

History and approval

The proposal received formal approval from the Scottish Parliament in July 2008 following environmental assessment and public consultation. The decision followed the statutory planning process and consideration of local and national policies on renewable energy. For further information on the project application and documentation see project materials and regional planning resources at South Lanarkshire authorities.

Construction, cost and timeline

At the time of approval, estimates placed the construction cost at around £600 million, with an anticipated completion date in 2011. Large onshore projects typically require phased construction, including transportation of components, turbine assembly, electrical works and commissioning. Details of parliamentary consideration and consenting are available from the legislature records at Scottish Parliament archives and national summaries at Scottish energy resources.

Importance, impacts and context

A development of this scale would have been significant for renewable energy capacity in Scotland, contributing to carbon reduction targets and electricity supply diversity. Onshore wind farms can yield local economic benefits such as construction employment and business for suppliers, while also raising environmental and visual-impact considerations that are typically debated during planning. Comparisons to existing sites—Whitelee near Glasgow was a noted reference point—help illustrate the scale and ambition of the proposal.

Notable distinctions

  • The project was described at approval as set to be Europe’s largest onshore wind farm by installed capacity.
  • Its turbines were to be sited on both sides of a major motorway, an unusual layout that posed logistical and visual considerations.
  • Reported estimates for homes powered (about 320,000) and total cost (roughly £600 million) were used to communicate public benefit and investment scale.

For official records, technical summaries and subsequent developments consult the listed links and local planning documents through the placeholders above.

Questions and answers

Q: What is the Clyde Wind Farm?

A: The Clyde Wind Farm is a proposed 548 MW wind farm in South Lanarkshire, Scotland.

Q: What makes the Clyde Wind Farm unique?

A: The Clyde Wind Farm will be Europe's largest onshore wind farm when completed.

Q: How many turbines will be in the Clyde Wind Farm?

A: The Clyde Wind Farm will have 152 turbines.

Q: Who is developing the Clyde Wind Farm?

A: Scottish and Southern Energy is developing the Clyde Wind Farm.

Q: How many homes can the Clyde Wind Farm power?

A: The Clyde Wind Farm is capable of powering 320,000 homes.

Q: Where will the turbines be built in relation to the M74 motorway?

A: The turbines for the Clyde Wind Farm will be built on either side of the M74 motorway.

Q: What is the estimated cost and completion date for the Clyde Wind Farm?

A: The Clyde Wind Farm is estimated to cost £600 million and is expected to be completed in 2011.